Installing racks
Figure 18
Securing the rack to the floor (seismic-qualified installation)
4
5
72
Line up the rack. Use the level to check leveling and alignment of the rack at the base, top,
and both sides. If needed, insert a shim under the base to ensure correct leveling.
Note — The maximum shim height to achieve the allowable vertical
deviation is 0.75 in. (19 mm).
Apply torque to the red cap of each bolt until the retaining pins shear. Remove the cap to
expose the green tabbed ring. The exposure of the green tabbed ring indicates proper
installation.
3HH-12893-AAAA-TCZZA
ANSI Hardware Installation Manual
Cover plate
Slotted plate
Anchor bolts
Anchor plate(s)
18 mm hole size
Anchor bolts
Anchor plate
Slotted plate
DRAFT
Minimum
embedment
line
Concrete
floor
22365
Issue: 09