Table 5-1. Maintenance Schedule - Teledyne T200 User Manual

No/no2/nox analyzer with numaview software
Hide thumbs Also See for T200:
Table of Contents

Advertisement

Table 5-1. Maintenance Schedule

ITEM
ACTION
Dashboard
Review and
functions
evaluate
Particulate filter
Change
Zero/span check
Evaluate offset
and slope
Zero/span
Zero and span
calibration
calibration
External zero air
Exchange
scrubber option
chemical
External dryer
Replace
option
chemical
Software/
Check for
Firmware
updates
Ozone cleanser
Change
chemical
Reaction cell
Clean
window ("optical
filter")
DFU filters
Change
Pneumatic sub-
Check for leaks
system
in gas flow paths
Reaction cell O-
Replace
rings & sintered
filters
PMT Sensor
Low-level
Hardware
hardware
Calibration
calibration
Pump
Rebuild head
Inline Exhaust
Replace
Scrubber
NO
converter
Replace
2
converter
Desiccant bags
Replace
083730200A DCN7962
FREQ
Weekly
Monthly or as
necessary
Weekly
Every 3 months
Every 3 months
When indicator color
changes
Every 6 months or
whenever serviced
Annually
Annually or as
necessary
Annually (or as
needed for highly
polluted sample air)
Annually or after
repairs involving
pneumatics
Annually
When PMT/ preamp
changes or if slope is
outside of 1.0±0.3
when Rx Cell
pressure exceeds 10
in-Hg-A (at sea level)
Annually
Every 3 years or if
conversion efficiency
drops below 96%
Any time PMT
housing is opened for
maintenance
Teledyne API T200 NO/NO
CAL
DATE PERFORMED
CHECK
REQ'D
No
No
No
Yes
No
No
Yes
Yes
Yes
No
Yes if a
leak is
repaired
Yes
Yes
Yes
No
Yes
n/a
/NO
Analyzer with NumaView™ Software
2
x
107

Advertisement

Table of Contents
loading

Table of Contents