With no power to the unit, carefully remove the top cover of the instrument and check for
internal shipping damage by carrying out the following steps:
1. Carefully remove the top cover and check for internal shipping damage.
2. Inspect the interior of the instrument to ensure all circuit boards and other
3. Check the connectors of the various internal wiring harnesses and
4. Verify that all of the optional hardware ordered with the unit has been
V
ENTILATION
Whether the instrument is set up on a bench or installed in a rack, be sure to leave sufficient

ventilation clearance.

Table 2-1. Ventilation Clearance

Back of the instrument
Sides of the instrument
Above and below the instrument
083730200A DCN7962
a. Remove the screws located on the instrument's sides.
b. Slide the cover backward until it clears the instrument's front bezel.
c. Lift the cover straight up.
components are intact and securely seated.
pneumatic hoses to ensure they are firmly and securely seated.
installed. These are listed on the paperwork accompanying the instrument.
WARNING – ELECTRICAL SHOCK HAZARD
Never disconnect PCAs, wiring harnesses or electronic
subassemblies while under power.
C
LEARANCE
AREA
Teledyne API T200 NO/NO
MINIMUM REQUIRED CLEARANCE
10 cm / 4 in
2.5 cm / 1 in
2.5 cm / 1 in
/NO
Analyzer with NumaView™ Software
2
x
19

Advertisement

Table of Contents
loading

Table of Contents