Installation Of Ptt Unit/Gas Shock Absorber - TOHATSU MFS25 Service Manual

Hide thumbs Also See for MFS25:
Table of Contents

Advertisement

Bracket

26) Installation of PTT Unit/Gas Shock Absorber

Fully tilt up outboard motor and lock with tilt stopper 1.
1.
Be sure to lock outboard motor with tilt
stopper after tilting up. Leaving outboard
motor without locking may lead to
accidental descent due to reduction of PTT
hydraulic pressure.
Reinstall bushings 2, 3 and 4 to their original positions.
2.
Install PTT unit 5 or gas shock absorber 6, and then
3.
cylinder shaft (lower) 7.
Retract tilt rod a little.
Attach "C" ring 8.
4.
5.
Connect lead wires to battery to fully stretch tilt rod.
Install cylinder shaft (upper) 9 and tighten bolt 0.
6.
7.
Run PTT motor lead wires through hole and secure them
using clamps q and w and screws e.
Connect earth lead r to PTT unit bottom and secure with
8.
bolt t.
Install thrust rod y.
9.
7-32
WARNING
1
w
e
q
e
y
t
2, 3 and 4 Bushings
5 PTT Unit
6 Gas Shock Absorber
7 Cylinder Pin (Lower)
8
8 "C" Ring
9 Cylinder Pin (Upper)
0 Bolt
q and w Clamps
e Screw
r Earth Lead
t Bolt
y Thrust Rod
0
9
8
2
3
3
5
4
r
t
7
6
4
25/30 2006

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mfs 30b

Table of Contents