Power Unit
41) Installation of Power Unit
1.
Clean mating surface of power unit and attach new gasket
1.
Install power unit 2.
2.
Tighten power unit installation bolts 3 in two or three steps
3.
to specified torque.
Power Unit Installation Bolt :
7 N · m (5 lb · ft) [0.7 kgf · m]
Be careful not to catch wires and hoses and other
parts between power unit and engine base.
Connect lead wires 4 of igniter and stop switch.
4.
Connect throttle wire 5. Refer to "3-15".
5.
5-52
2
1
5 5
3
4 4
4st 4/5/6 2020