2.Installation of Meters and Battery

1) Installation of Meters

When installing meters, select a place on the dash board 1
where operator can watch them easily and they are not
exposed to water spray.
The meters can be installed on the dash board 1 of 2 to
11mm thick. When the thickness is over 11mm, cut fitting
plate 2 so that the meters can be installed.
• Angle of Installation
Install meters so that the angle is in between 50 to 80
degrees from horizontal plane.
3 Large Sized Meters : Tachometer 3 and Speedometer
Installation Opening Diameter : 85mm (3-3/8 in)
4 Small Sized Meters : Trim Meter 5, Volt Meter, etc.
Installation Opening Diameter : 53mm (2-1/8 in)
• Tachometer
Set selector 1 to "12P" on the back of the meter.

2) Installation of Battery

When using battery, select the one with capacity ranging from
12V 70AH (350CCA or 465MCA) to 12V 100AH(775CCA or
1000MCA at below freezing temperature).
1 Battery should be stored in battery storage box and
secured to hull to prevent it from falling due to rolling or
pitching or any shock in the place where it is protected
from water spray.
2 When connecting battery cables, connect positive cable
(red) and then negative cable (black). (Reverse the order
when disconnecting.)
Positive cable is the one with red tube on the terminal end.
• Before using battery, thoroughly read
warning label.
• Do not disconnect battery cable during