Air-Purging Ptt Unit (Separated From Outboard Motor) - TOHATSU MFS25 Service Manual

Hide thumbs Also See for MFS25:
Table of Contents

Advertisement

Bracket
25) Air-Purging PTT Unit
(separated from outboard motor)
Turn manual valve 1 counterclockwise fully.
1.
Manual Valve :
2 N·m ( 1.5 lb·ft ) [ 0.2 kgf·m ]
Place PTT unit 2 vertically.
2.
Remove cap 3 and check fluid level in the reservoir tank.
3.
Check fluid level with tilt rod fully
stretched. Removing reserve tank cap at
halfway position can cause blasting out of
PTT fluid, which is dangerous, and also
result in inaccurate fluid level reading.
Spill of some fluid from plug hole as cap is
removed indicates that gear case is filled with
specified quantity of gear oil.
4.
Add recommended PTT fluid to specified level if it is lacking.
Recommended PTT Fluid :
OIL
ATF DEXRON III
Put cap 3 and tighten to specified torque.
5.
Reserve Tank Cap :
1.5 N·m ( 1.1 lb·ft ) [ 1.5 kgf·m ]
6.
Reconnect PTT motor lead wires to battery terminals to fully
retract tilt rod.
Tilt Rod
Retraction
7-30
WARNING
Battery Terminals
PTT Motor Lead Wires
Green (G)
+ : Positive Terminal
Blue (L)
– : Negative Terminal
1
3
2
G
L
25/30 2006

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mfs 30b

Table of Contents