Position Of On/Off Switch For Function Test And Running (Drop) Test - TOHATSU MFS25 Service Manual

Hide thumbs Also See for MFS25:
Table of Contents

Advertisement

3.Position of ON/OFF switch for function
test and running (drop) test
In principle, use 3AC DIAGNOSIS with the switch set to
OFF.
Use ON position only for function test and running (drop)
test.
OFF : Test history is updated.
Use this position for other than function test and running
(drop) test.
ON : Test history is not updated.
Use this position for function test and running (drop) test.
25/30 2006
9
9-23

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MFS25 and is the answer not in the manual?

This manual is also suitable for:

Mfs 30b

Table of Contents

Save PDF