Air-Purging Ptt Unit (Separated From Outboard Motor); Air-Purging Ptt Unit (Installed On The Outboard Motor) - TOHATSU MFS25 Service Manual

Hide thumbs Also See for MFS25:
Table of Contents

Advertisement

27) Air-Purging PTT Unit
(installed on the outboard motor)
1.
Install outboard motor on the boat.
2.
Fully tilt up outboard motor and lock with tilt stopper.
Remove cap 2 and check fluid level in the reservoir tank.
3.
4.
Turn manual valve counterclockwise fully.
5.
Tilt up outboard motor fully with hands and let it tilt down
gravitationally.
6.
Turn manual valve clockwise fully.
Manual Valve :
2 N·m ( 1.5 lb·ft ) [ 0.2 kgf·m ]
7.
Leave the unit for five minutes to stabilize PTT fluid.
8.
Push PTT switch to check that outboard motor fully tilt up.
If not, loosen manual valve, tilt up with hands
and lock with tilt stopper.
Lock outboard motor with tilt stopper 1.
9.
Be sure to lock outboard motor with tilt
stopper after tilting up. Leaving outboard
motor without locking may lead to
accidental descent due to reduction of PTT
hydraulic pressure.
Remove cap 2 and check fluid level in the reservoir tank.
10.
Check PTT fluid level with outboard motor
fully tiled up. Removing reserve tank cap at
halfway position can cause blasting out of
PTT fluid, which is dangerous, and also
result in inaccurate fluid level reading.
Spill of some fluid from plug hole as cap is
removed indicates that gear case is filled with
specified quantity of gear oil.
25/30 2006
WARNING
WARNING
1
2
7
7-33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mfs 30b

Table of Contents