Installation Of Power Unit - TOHATSU MFS 4 Service Manual

Table of Contents

Advertisement

Power Unit

41) Installation of Power Unit

1.
Hold power unit as shown.
2.
Clean mating surface of power unit and attach new gasket
1.
3. Install power unit 2 , and tighten bolts 3 in two or three steps
to specified torque.
Power Unit Installation Bolt :
7 N · m (5 lb · ft) [0.7 kgf · m]
Be careful not to catch wires and hoses and other
parts between power unit and engine base.
Connect lead wires 4 of igniter and stop switch.
4.
Connect throttle wire 5. Refer to "3-15".
5.
5-50
2
1
4
4
5 5
3
4st 4/5/6 2011

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mfs 5Mfs 6bMfs 6c

Table of Contents