Check electrical conductivity between terminals 2 and 3. If
9.
non conductive, replace DOWN side PTT solenoid.
29) Inspection of PTT Switch
1.
Check electrical conductivity of PTT switch. Replace if other
than specified conditions.
Lead Wires
Switch Position Sky Blue (Sb)
UP (Tilt Up)
Free
DOWN (Tilt Down)
25/30 2006
Red (R)
Pink (P)
ç
DOWN
B
2
3
-
+
P
7
7-35