This procedure requires that you handle components that are sensitive to electrostatic
Caution -
discharge. This discharge can cause failure of server components.
1.
Orient the SCC PROM properly onto the main module.
2.
Press down on the SCC PROM until it is completely seated on the main module.
3.
Insert the main module back into the server.
See
"Install the Main Module" on page
4.
Return the server to operation. See
Operation" on page
Related Information
"Remove the SCC PROM" on page 133
■
"Verify the SCC PROM" on page 136
■
105.
"Returning the Server to
201.
Install the SCC PROM
Servicing the SCC PROM
135