DK424i Installation
Step 2: Mount Cabinets
Wrap the cables in with the mesh tie. The purpose of the wrap is to shield the cables from EMI/RFI
effects. See
25-Pair
Amphenol
Cables
To
MDF
Figure 7-10 Cabinet Amphenol Cables
7-16
Figure
7-10.
Knock Out Plastic
Top
To MDF
Front
Cable Shield
(B50MT)
1. Attach lead to grounding screw.
2. Wrap mesh around
communication cables.
3. Secure with velcro strap.
CAUTION!
Mesh strap should not touch
cabinet metal surfaces.
25-Pair
Amphenol
Cables
Part No. B50MT comes with the Base
Cabinet. It must be ordered separately
for each Remote Cabinet pair.
Strata DK I&M
5045
6/00