Scalar i2000 User's Guide
Require Intervention means that a user must manually use the Physical
Ports tab to bring a failed port that has recovered back online.
8 Configure the Primary Port. Only ports that are in target mode and
point-to-point connection can participate in host port failover. The
primary port becomes active by default and the alternate port will go
on passive standby until a failover occurs. Use the Select Primary
drop-down list to select from the target ports that are online and
available. You must select a primary port. Current Active indicates
the currently active port.
9 Click Set. If your configuration has errors, a warning message
appears.
Enabling a Target Port
Use the Physical Ports tab to manually enable an online target port that
was disabled because of a previous connection error. If the Intervention
column displays "true," you must manually bring the recovered port back
online using Enable. If the port state is "disabled," the port's connection is
repaired and it is ready to be re-enabled. If the Configuration tab itself is
disabled, the table on the Physical Ports tab will be empty.
If the target port state is offline, the port's
Note
connection has not been repaired. The error
condition that caused the port to fail still exists.
1 On the FC Host Port Failover dialog box, click the Physical Ports tab.
Chapter 4 Configuring Your Library
Managing Connectivity
4
135
Need help?
Do you have a question about the scalar i2000 and is the answer not in the manual?