Scalar i2000 User's Guide
The get/put graphical report shows the results for tests of the
Get/Put
picker assembly while performing one get and one put function for each
tape magazine. The picker will use the selected scratch tape or the existing
tape if it finds one at the target.
• If the graphical report shows a failed result for one or more tape
magazines, make sure the magazines at the location of the failure are
installed properly.
• If there are multiple marginal results in an area, review the area to
make sure it is not prone to problems. Also run the library alignment
test (part of the installation verification or partial frame test) to make
sure the library is level.
• If there are a large number of issues, use rubbing alcohol to clean the
picker fingers and the detents in the side of the tapes.
• If the problems persist, you may need to replace the picker assembly.
See
figure 27
on page 297.
Chapter 5 Maintaining Your Library
Maintenance Actions
5
296
Need help?
Do you have a question about the scalar i2000 and is the answer not in the manual?