CHAPTER 4
Preparing the Site for M10i Router
Installation
M10i Router Site Preparation Checklist
Table 9: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances.
Power
Measure distance between external power
sources and router installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the configuration.
Rack
Copyright © 2010, Juniper Networks, Inc.
All manuals and user guides at all-guides.com
M10i Router Site Preparation Checklist on page 39
M10i Rack Requirements on page 40
Clearance Requirements for Airflow and Hardware Maintenance on page 43
The checklist in Table 9 on page 39 summarizes the tasks you need to perform when
preparing a site for router installation.
For More Information
"M10i Router Environmental
Specifications" on page 185
"M10i Router DC Power Supply
Specifications" on page 191
"M10i Router AC Power Supply
Specifications" on page 191
"M10i Chassis Grounding Cable and
Lug Specifications" on page 187
"M10i Router Power Requirements"
on page 188
Performed By
Date
39