Reinstalling The T640 Sibs; Figure 77: Reinstalling An Lcc-Cb - Juniper T640 Hardware Manual

Core router
Hide thumbs Also See for T640:
Table of Contents

Advertisement

Reinstalling the T640 SIBs

Copyright © 2013, Juniper Networks, Inc.

Figure 77: Reinstalling an LCC-CB

To reinstall the SIBs (see
Figure 78 on page
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to an approved site ESD grounding point. See the instructions for your site.
Place one hand underneath the SIB to support it. With the other hand, hold one of the
2.
ejector handles on the SIB faceplate.
Carefully align the sides of the SIB with the guides inside the chassis.
3.
Slide the SIB into the chassis, carefully ensuring that it is correctly aligned.
4.
Grasp both ejector handles and press them inward to seat the SIB.
5.
Tighten the captive screws on the ejector handles.
6.
Repeat the procedure for each of the remaining SIBs.
7.
Chapter 10: Installing the T640 Router Without a Mechanical Lift
128):
127

Advertisement

Table of Contents
loading

Table of Contents