Preparing for T640 Router Installation

T640 Site Preparation Checklist

Table 36: Site Preparation Checklist

Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances.
Power
Measure distance between external power
sources and router installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Rack
Verify that your rack meets the minimum
requirements for the installation of the router.
Plan rack location, including required space
clearances.
Copyright © 2013, Juniper Networks, Inc.
T640 Site Preparation Checklist on page 81
T640 Rack Requirements on page 82
T640 Clearance Requirements for Airflow and Hardware Maintenance on page 83
The checklist in
Table 36 on page 81
preparing a site for router installation.
For More Information
"T640 Environmental Specifications"
on page 423
"T640 DC Power Distribution" on
page 433
"T640 DC Power Cable and Lug
Specifications" on page 432
"T640 Chassis Grounding Cable and
Lug Specifications" on page 425
"T640 DC Power System
Requirements" on page 430
"T640 Rack Requirements" on
page 82
"T640 Clearance Requirements for
Airflow and Hardware Maintenance"
on page 83
summarizes the tasks you need to perform when