CA00E890 • CA26TTSS
CA00E890
Explanation: Starting to initialize open firmware
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA00E891
Explanation: Finished initializing open firmware
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA00EAA1
Explanation: Probe PCI-PCI bridge bus
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA060203
Explanation: An alias was modified or created
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA26FFFF
Explanation: An extended item was required for lpevent to complete.
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA26TTSS
Explanation: Waiting for lpevent of type tt and subtype ss.
Response:
1. Reboot the server.
2. If the problem persists:
a. Go to Checkout procedure.
b. Replace the system-board, as described in Replacing the system-board and chassis assembly.
278
Power Systems: IBM Flex System p270 Compute Node Installation and Service Guide

Advertisement

Table of Contents
loading

Table of Contents