IBM Flex System p270 Compute Node Installation And Service Manual page 240

Table of Contents

Advertisement

C1009X18 • C1009X28
C1009X18
Explanation: Hardware object manager (HOM): GARD in progress
Response:
1. Search RETAIN tips and the firmware change history for the reference code to determine the recommended
actions. If a firmware update is needed, see Updating the firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C1009X1C
Explanation: Hardware object manager: (HOM): clock test in progress
Response:
1. Search RETAIN tips and the firmware change history for the reference code to determine the recommended
actions. If a firmware update is needed, see Updating the firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C1009X20
Explanation: Frequency control IPL step in progress
Response:
1. Search RETAIN tips and the firmware change history for the reference code to determine the recommended
actions. If a firmware update is needed, see Updating the firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C1009X24
Explanation: Asset protection IPL step in progress
Response:
1. Search RETAIN tips and the firmware change history for the reference code to determine the recommended
actions. If a firmware update is needed, see Updating the firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C1009X28
Explanation: Memory configuration IPL step in progress
Response:
1. Search RETAIN tips and the firmware change history for the reference code to determine the recommended
actions. If a firmware update is needed, see Updating the firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
228
Power Systems: IBM Flex System p270 Compute Node Installation and Service Guide

Advertisement

Table of Contents
loading

Table of Contents