To align the gear racks in a multi-module library:
1. Slightly push up and pinch the gear rack locking mechanism (
2. While pinching the gear rack locking mechanism (
3. Manually inspect the track to ensure there are no gaps.
4. Repeat Steps 1 through 3 for the other gear rack.
5. Manually raise the picker and disengage the picker locking mechanism (
Figure 12-11. Picker assembly locking mechanism
Rear Panel Components
The library has the following rear panel customer replaceable units (CRUs):
v Drive Sled
v Library Control Blade (LCB)
v Library Power Supply
Adding/Removing/Replacing a Drive Sled
Tape drives mounted in sleds are installed into tape drive slots in the rear of the
library.
Figure 12-10 on page 12-14) to unlock the gear rack in the control module.
12-14), push the gear rack down until it aligns with the gear rack in the
expansion module, then release your hold on the locking mechanism.
Figure 12-11) if necessary. If the gear racks are properly aligned, the picker will
slowly move to the bottom of the library.
1
2
Chapter 12. Add, Remove, and Replace Procedures
1
in
in Figure 12-10 on page
1
in
12-15