Replacing A Power Supply - IBM System Storage TS3310 Setup And Operator Manual

Tape library
Hide thumbs Also See for System Storage TS3310:
Table of Contents

Advertisement

Figure 3-30. Tape Drive (detail)
3. Tighten the two thumb screws ( 2 in Figure 3-30) that hold the drive sled in
4. Repeat this procedure for all drives to be re-installed in the library.

Replacing a Power Supply

1
place by turning them clockwise.
2
4
Chapter 3. Installing A New Library in a Rack
5
3
3-31

Advertisement

Table of Contents
loading

Table of Contents