IBM System Storage TS3310 Setup And Operator Manual page 277

Tape library
Hide thumbs Also See for System Storage TS3310:
Table of Contents

Advertisement

Figure 12-15. Library Control Blade (LCB)
3. Grasp the pair of latches (
4. Simultaneously grasp the same pair of latches again, and slowly pull them
5. Once the LCB has been removed from the control module, carefully lay it
2
1
3
4
Module communication
1
terminator
Ethernet cable (customer
2
supplied)
3
Latches
LCB. Simultaneously push the latches to the left, and then pull them out and
away from the LCB.
toward you. As the LCB begins to slide out of the control module, be sure to
support the LCB from underneath, being careful to touch only the metal cover
and the ground plane.
Important: DO NOT touch any components on the LCB firmware board.
Hold it by the metal cover and support it by the metal ground
plane along the bottom edge.
(Figure 12-16 on page 12-20) on a clean, flat surface.
4
Module-to-module communication cable
5
Ethernet port (for IBM service personnel use)
6
Serial port (for IBM service personnel use)
3
in Figure 12-15) near the top and bottom of the
Chapter 12. Add, Remove, and Replace Procedures
5
6
12-19

Advertisement

Table of Contents
loading

Table of Contents