Reinstalling The Fpcs After Installing The Mx240 Router Without A Lift; Figure 71: Reinstalling A Dpc - Juniper MX240 Hardware Manual

3d universal edge router
Hide thumbs Also See for MX240:
Table of Contents

Advertisement

MX240 3D Universal Edge Router Hardware Guide

Reinstalling the FPCs After Installing the MX240 Router without a Lift

194

Figure 71: Reinstalling a DPC

To reinstall a DPC (see
Figure 72 on page
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to one of the ESD points on the chassis.
Place the FPC on an antistatic mat or remove it from its electrostatic bag.
2.
Identify the two DPC slots on the router where the FPC will be installed.
3.
Verify that each fiber-optic transceiver on the PIC is covered by a rubber safety cap.
4.
If it does not, cover the transceiver with a safety cap.
Orient the FPC so that the faceplate faces you.
5.
Lift the FPC into place and carefully align the sides of the FPC with the guides inside
6.
the card cage.
Slide the FPC all the way into the card cage until you feel resistance.
7.
Grasp both ejector handles and rotate them clockwise simultaneously until the FPC
8.
is fully seated.
195):
Copyright © 2017, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents