Option Installation; Option Installation; Prior To Installing The Option - YASKAWA Z1000 User Manual

Ac drive for hvac fan and pump
Hide thumbs Also See for Z1000:
Table of Contents

Advertisement

6.4 Option Installation

6.4

Option Installation

This section provides instructions on installing the options in
u

Prior to Installing the Option

Prior to installing the option, wire the drive, make necessary connections to the drive terminals, and verify that the drive
functions normally without the option installed.
Table 6.2
below lists the options that can be connected to the drive and the drive ports for connecting those options.
SI-W3, SI-EM3, SI-EN3
Figure 6.2
shows an exploded view of the drive with the option and related components for reference.
A – Drive front cover
B – HOA keypad
C – LED label (for communication
D – Drive terminal cover
E – Removable tabs for wire routing
F – Included screws
248
Table 6.2 Option Installation
Option
H
G
F
options)
Figure 6.2 Drive Components with Option
Table
6.2.
I
K
J
E
D
G – Ground wire
H – Drive grounding terminal (FE)
I – Connector CN5-A
J – Insertion point for CN5 connector
K – Option
YASKAWA TOEP YAIZ1U 03B YASKAWA AC Drive – Z1000 User Manual
Port/Connector
CN5-A
A
B
C
NS
NS
MS
MS

Advertisement

Table of Contents
loading

Table of Contents