Mitsubishi LJ61BT11 User Manual page 435

Melsec l series cc-link system master/local module
Table of Contents

Advertisement

App - 71
(6) Operating procedure of the loop test
[Diagnostics]
1) Select "CC-Link" for "Module Setting".
2) Specify the target master module of loop test for "Module No." or "I/O
Address".
3) Click the Start Monitoring button.
4) Click the Loop Test button.
5) When checking the communication status of all stations
Select "All stations" for "Target station", and click the Execute Test
button.
6) When checking the communication status of specified modules
Select "Selected station No." for "Target station", specify the station
number, and click the Execute Test button.
[CC-Link / CC-Link/LT diagnostics]
APPENDIXES
App - 71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

L26cpu-bt

Table of Contents