8-98 CHASSIS
• Place the drive chain link being disjointed on the holder part
of the tool.
• Turn in both the adjuster bolt and pressure bolt "A" so
that each of their end hole fits over the chain joint pin properly.
• Tighten the pressure bolt "A" with the bar.
• Turn in the pressure bolt "B" with the bar and force out
the drive chain joint pin .
Continue turning in the pressure bolt "B" until the
joint pin has been completely pushed out of the chain.
NOTE:
After the joint pin is removed, loosen the pressure bolt "B"
and then pressure bolt "A" .
• Remove the joint pin of the other side of joint plate.
Never reuse joint pins, O-rings and plates. After joint
pins, O-rings and plates have been removed from the
drive chain, the removed joint pins, O-rings and plates
should be discarded and new joint plate, O-rings and
plate must be installed.
DRIVE CHAIN CONNECTING
JOINT PLATE INSTALLATION
• Set up the special tool as shown in the illustration.
Tool body
Grip handle
Joint plate holder
(engraved mark "F50")
Wedge holder & wedge pin
• Connect both ends of the drive chain with the joint pin
inserted from the wheel side " as installed on the motorcycle.
O-ring ... 4 pcs.
Joint plate
Joint set part number
DID: 27620-40F00
Do not use joint clip type of drive chain. The joint clip
may have a chance to drop which may cause severe
damage to motorcycle and severe injury.
Adjuster bolt
(without hole)
Pressure bolt "A"
Bar
(F50)