Installation - Suzuki GSX-R1000 2007 Service Manual

Table of Contents

Advertisement

INSTALLATION

Install the front fork in the reverse order of removal. Pay atten-
tion to the following points:
• Set the upper surface of the outer tube height " at 7.0 mm
(0.276 in) from the upper surface of the steering stem upper
bracket and tighten the front fork lower clamp bolts  to the
specified torque.
" Front fork lower clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
• Tighten the front fork cap bolt  to the specified torque and
recheck the front fork outer tube upper surface height " from
the upper surface of the steering stem upper bracket.
" Front fork cap bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
• Position the handlebars on the upper bracket. (
• Tighten the front fork upper clamp bolt  and handlebar
clamp bolt .
" Front fork upper clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
Handlebar clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
• Remount the front wheel. (
• Cable routing (
10-17)
• Front brake hose routing (
8-40)
8-14)
10-21)
CHASSIS 8-27

Advertisement

Table of Contents
loading

Table of Contents