Installing The Chsgw Small Batt Box On The 9.5" Chassis; Chsgw Small Batt Box Installation - NEC Univerge SV9100 Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 1.2
6.3
3 - 70
9.
Insert tabs on cover into holes on CHS LARGE BATT BOX. Slide the
cover left until seated and tighten the screw.

Installing the CHSGW SMALL BATT BOX on the 9.5" Chassis

An optional, CHSGW SMALL BATT BOX can be installed to provide external
battery power to the CHS2UG chassis during a power failure. The short-term
battery box will power the system for approximately 10 minutes.
6.3.1

CHSGW SMALL BATT BOX Installation

1.
Power down the CHS2UG chassis.
2.
Disconnect AC power cable from rear of chassis.
3.
Align the Small Battery cable assembly with the grooves underneath
the Base (CHS2UG) chassis. Use the two M3 x 8 screws provided to
secure the cable assembly in place (refer to
Battery Cable Assembly on page
Figure 3-98 Installing Cover Battery
Ensure the CHS2UG chassis is powered OFF.
3-71).
Installing the SV9100 Chassis
UNIVERGE SV9100
Figure 3-99 Installing

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents