Connectors - NEC Univerge SV9100 Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 1.2
4 - 68
2.
Before proceeding to Step 3, wait to verify that the STATUS
LED starts to flash.
3.
Connect the cable from the NT1 Network Termination cable to
the CN7 or CN8 connector on the GCD-2BRIA and/or
PZ-2BRIA daughter board.
5.4.3

Connectors

Table 4-35 PZ-2BRIA RJ-45 T-Bus Cable Connector Pin-Outs
the pin-outs for the RJ-45 cable connector for S-Bus and T-Bus
connections. Refer to
Board on page 4-66
connectors on the PZ-2BRIA daughter board.
Table 4-35 PZ-2BRIA RJ-45 T-Bus Cable Connector Pin-Outs
With normal operation, the status LED
flashes fast. If trouble was found during
the self diagnostics routine, the status
LED flashes slow.
Once connected, the PKG LED will not
be indicated for the status of Layer 1 link.
Figure 4-17 Installing the PZ-2BRIA Daughter
for an illustration showing the location of the
RJ-45 Cable Connector – CN2
S-Bus Connection
Pin No.
1
2
3
4
5
6
7
8
UNIVERGE SV9100
Connection
RA
TA
TB
RB
Installing the SV9100 Blades
show

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents