From the factory, the SG, ETH and PBXG grounds are located inside the chassis
and are connected to the FG (frame ground) on the back of the chassis.
Power Switch
and LED
For External Battery
(12V Connection)
1.2.1

Install Grounding on 9.5" Chassis

1.
Ensure the 9.5" chassis is powered off and the AC power cord is
unplugged.
2.
Ground the chassis by connecting a 14 AWG wire from the FG lug on
the back side of the chassis to an electrical service ground (such as a
cold water pipe). Refer to
4.2 Stand Mounting the 9.5" CHS2UG B Chassis on
Figure 3-26 9.5" Chassis (Front View)
Figure 3-27 9.5" Chassis (Rear View)
Ground
Figure 3-27 9.5" Chassis (Rear
Issue 1.2
3 Universal Slots
(Slot 1 for CPU)
CHS2UG
Chassis
AC Inlet
View).