Install Grounding On 19" Chassis - NEC Univerge SV9100 Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

UNIVERGE SV9100
System Hardware Manual
3.
1.1.3

Install Grounding on 19" Chassis

From the factory, the SG, ETH and PBXG grounds are located inside the
chassis and are connected to the FG ground (frame ground) on the back of
the chassis.
Each chassis (CHS2UG) in the system must be grounded separately using
the procedure listed below.
1.
Ensure each Chassis is powered down and unplugged.
2.
Ground each chassis by connecting a 14 AWG wire from the FG lug
on the back side of the chassis to an electrical service ground (such as
Figure 3-21 System Expansion Cabling
Install in Expansion
Install in Expansion
Install in Expansion
Install in Controlling
Repeat for additional Expansion Chassis.
Chassis
Chassis
Chassis
Chassis
Issue 1.2
3 - 13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents