Figure 2-47 Securing The Battery Box; Ip4Ww-Battery Box To Chassis Connection - NEC SL2100 Hardware Manual

Hide thumbs Also See for SL2100:
Table of Contents

Advertisement

ISSUE 1.0
6.
Using one supplied screw (M3x6 with washer), secure the back plane of the Battery Box to the
FM/WM Base.

2.7 IP4WW-Battery Box to Chassis Connection

To avoid damage to equipment, do not install the Topaz Battery Box
(DX2E-32i/NX7E Battery Box) to the SL2100 system.
• Make sure the system power is off.
• If Expansion Chassis are installed, turn the power on/off in the order of
Expansion 2 Chassis, Expansion 1 Chassis and then Main Chassis.
1.
Power off the Chassis and disconnect AC cord.
Hardware Manual
Two screw holes
(Use either one)
< Front view>

Figure 2-47 Securing the Battery Box

SL2100
2-35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents