NEC Univerge SV9100 Hardware Manual page 340

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 1.2
5 - 80
3.
Remove the screw (refer to
Side Panel from Multiline Terminal on page
4.
Carefully, return the multiline terminal to the buttons
side up position.
5.
Remove the soft keys and line key kit from the
telephone.
6.
Gently lift the small black bar on the ribbon cable
connector (refer to
Connector).
Figure 5-78 Ribbon Cable Connector
7.
Plug ribbon cable on back of 8LKD (LD)-L UNIT into
connector until pressure is felt.
8.
Press down on the black bar to lock the cable into
place (refer to
on page
5-81).
Installing DT Series Digital and IP Multiline Terminals
UNIVERGE SV9100
Figure 5-77 Remove
Figure 5-78 Ribbon Cable
Lift
Here
Figure 5-79 Ribbon Cable Installed
5-79).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents