NEC Univerge SV9100 Hardware Manual page 419

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

UNIVERGE SV9100
System Hardware Manual
CN4, CN5
Figure 6-6 Connecting Cable to the PGD(2)-U10 ADP
6.
Repeat Steps 4 and 5 for any additional connections required.
7.
Replace the cover and tighten the screw to hold the cover in place.
8.
If required for the function being used, insert the RCA connectors into
the CN2 (Channel 1) and CN3 (Channel 2) connectors on the back of the
PGD(2)-U10 ADP.
Flat-head screwdriver
Cable
Press down
Issue 1.2
6 - 7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents