Chapter 3 Installing The Sv9100 Chassis; Section 1 General Information; Installing The 19" (Chs2Ug) Chassis - NEC Univerge SV9100 Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Installing the SV9100 Chassis
G
S
1
ENERAL
ECTION
This chapter contains information to help the technician install the chassis
for the SV9100 system. The technician should be familiar with this section
before installing any equipment.
1.1
System Hardware Manual
I
NFORMATION

Installing the 19" (CHS2UG) Chassis

The CHS2UG chassis has six universal blade slots for legacy line/trunk
blade (Single Line Telephone Interface, Digital multiline terminal
Interface, Central Office Trunk, ISDN PRI Interface, etc.). In-skin
Application Blades (In-skin UMS, In-Skin Router, etc.). It also houses
the BUS Interface Blade, Power Supply Unit (PSU) and Cooling Fan.
When the GCD-CP10 blade is installed in the first 19" chassis, it is
called the controlling chassis. Additional chassis, called expansion
chassis, can be installed to increase the capacity of the system to meet
the customer's business needs. Each chassis (Expansion or
Controlling), is powered by an MPS7101 power supply.
Chapter
3
3 - 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents