NEC Univerge SV9100 Hardware Manual page 131

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

UNIVERGE SV9100
System Hardware Manual
Because of injury from falling equipment, wall mounting
m
the CHSG LARGE BATT BOX is not recommended.
Mounting the CHSG LARGE BATT BOX directly on the
m
floor is not recommended.
The CHS BASE UNIT raises the height of the CHSG
m
LARGE BATT BOX 120mm (4.72").
When the CHSG LARGE BATT BOX and CHS2UG are
m
connected for long term use, the CHS2UG JOINT
BRACKET KIT is used.
1.
Use the template shown in below for required spacing before drilling
holes for 0.39" (10mm) anchor bolts (locally procured).
Figure 3-78 Floor Mount Spacing Guide
2.
Mark and drill the four holes required to install the CHS BASE UNIT.
Issue 1.2
3 - 59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents