NEC Univerge SV9100 Hardware Manual page 103

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

UNIVERGE SV9100
System Hardware Manual
4.
Align the upper and lower bracket holes with the heads of
anchor bolts mounted on the wall and slide downward
(refer to
Figure 3-40 Install Screws (Option 2)
5.
Connect grounding wire to chassis. Refer to Chapter 4 paragraph
Installing the 9.5" Chassis on page 3-18
grounding the system.
6.
Refer to
2.1 Installation and Safety Precautions on page 4-3
installation of blades.
2.2.2.2
Wall Mounting the CHS2UG with the CHS2UG B Small Batt
Box
To install the CHSGW SMALL BATT BOX refer to section
Installing the CHSGW SMALL BATT BOX on the 9.5" Chassis
on page 3-70
Align the bracket halves (refer to
1.
Figure 3-40 Install Screws (Option
for complete details on
Issue 1.2
2)).
1.3
for
6.3
Figure 3-37 Wall
3 - 31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents