Throttle Body - Mitsubishi Electric Lancer Evolution-VII Workshop Manual

Table of Contents

Advertisement

THROTTLE BODY

REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
Under Cover Removal and Installation
D
(Refer to GROUP 51 - Front Bumper.)
Engine Coolant Draining and Supplying
D
(Refer to GROUP 14 - On-vehicle Service.)
Strut Tower Bar Removal and Installation
D
(Refer to GROUP 42.)
19
2
3
5
Removal steps
1. Accelerator cable connection
2. Throttle position sensor connector
3. Idle speed control servo connector
4. Vacuum hose connection
Up
Towards front of vehicle
MPI -
3 N·m
4
6
5
INSTALLATION SERVICE POINT
"AA THROTTLE BODY GASKET INSTALLATION
Place the gasket so that the projecting part is positioned
as shown in the illustration, and then install it between the
intake manifold and the throttle body.
Throttle Body
Air Hose E, Air By-pass Hose, Air Pipe C Removal
D
and Installation (Refer to GROUP 15 - Intercooler.)
Accelerator Cable Adjustment (Refer to GROUP 17
D
- On-vehicle Service.) <Post-installation>
7
5. Water hose connection
6. Throttle body
"AA 7. Throttle body gasket
13A-143
5.0
1.0 N·m
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents