Installation; Receiving And Inspecting The Pathbuilder S330/S310 Switch - 3Com SuperStack II PathBuilder S330 Reference Manual

Wan access switches
Hide thumbs Also See for SuperStack II PathBuilder S330:
Table of Contents

Advertisement

2
Receiving and
Inspecting the
PathBuilder S330/S310
Switch
I
NSTALLATION
This chapter tells you how to mechanically and electrically install SuperStack II
PathBuilder S330 and SuperStack II PathBuilder S310 WAN access switches
(PathBuilder S330/S310 switch) in your network and describes the PathBuilder
S330/S310 ports and modules. It contains the following sections:

Receiving and Inspecting the PathBuilder S330/S310 Switch

Installation Overview
Installation Procedures
Before using this chapter for an actual installation, read through it at least once to
familiarize yourself with the overall process.
When you receive the PathBuilder S330/S310 switch, do the following:
1 Unpack and inspect the PathBuilder S330/S310 equipment for any damage that
might have occurred during shipment.
2 Inventory the equipment against the shipping notice.
3 Save the boxes and packing materials in the event there is damage or in case you
need to reship the unit at a future date.
4 If anything is damaged or missing, contact the shipper and 3Com immediately.
CAUTION: Many of the integrated circuits on the modules are sensitive to static
electricity. Always wear a properly-grounded antistatic wrist strap when removing
plug-in modules from the shelf.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Superstack ii pathbuilder s310

Table of Contents