3Com SuperStack II PathBuilder S330 Reference Manual page 278

Wan access switches
Hide thumbs Also See for SuperStack II PathBuilder S330:
Table of Contents

Advertisement

272
A
C: ATM F
PPENDIX
ORUM
IMA C
OMPLIANCE
Table 44 ATM Forum IMA Specification Compliance Table (continued)
Section
Description
5.2.2.2.2 ICP Cell Definition
5.2.2.3
IMA Frame Definition
5.2.2.3.1 ICP Cell Offset
5.2.2.3.2 IMA Frame Length (M)
5.2.2.4
Processing of the SCCI Field
5.2.2.5
IMA ID
5.2.2.6
Group Symmetry
Symmetrical and
Asymmetrical Operation
Configuration and Operation
6
Quality of Service
7
Support for Common and
Independent Transmit Clock
Operations
8
IMA Data Cell Rate
Implementation
8.1
Behavior of the Transmit End R-54
8.1.1
Derivation of the Transmit
IDCR from the TRL
8.1.2
Selection of the TRL
8.1.3
Stuffing on the TRL and
Other Links
8.2
Behavior of the Receive End
9
Differential Link Delay on
IMA
9.1
Differential Link Delay
Requirement on the
Transmitter
(continued)
Requirement
3Com
/Option
Compliance Comments
R-18-20
FC
R-21
FC
R-22-24
FC
R-25-28
FC
R-29,30 O-1,31
FC
O-1 NC
R-32,33, O-2, 34,
FC
CR-1-3, 35
O-2,CR-1-3
NC
R-36,37
FC
R-38,39
FC
R-40-43
FC
O-3,4
NC
R-44
FC
R-45
FC
R-46-53, O-5
FC
O-5 NC
O-6
NC
None
Noted
FC
R-55
FC
R-56-59
FC
R-60, CR-5,6
FC
CR-5,6 NC
R-61-63
FC
None
R-64
FC
Asymmetrical
operation will
not be
supported.
See above.
ITC mode not
supported
Will
interoperate
with equipment
that does
support this.
option.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Superstack ii pathbuilder s310

Table of Contents