Four-port IMA module — A board consisting of four T1/E1 UNI with IMA
ports. It adds four ports to the four existing T1/E1 UNI with IMA ports on the
PathBuilder S330 base module, thereby providing 8-port IMA support. Install
the four-port IMA module in slot 9. Figure 10 shows the IMA expansion
module connections.
Figure 10 Four-port IMA Expansion Card Connections

ESD Precautions

When installing plug-in modules, take the following precautions to prevent ESD
(electrostatic discharge) from damaging the internal components of the
PathBuilder S330/310:
Always wear a properly-grounded anti-static wrist strap.
Transport static-sensitive components in anti-static packaging.
Keep static-sensitive components in their anti-static packaging until you are
ready to install them.
Just before removing components from their anti-static packaging, discharge
static electricity from your body by touching an unpainted metal surface.
When you remove modules from the shelf, place them printed circuit side
down on a nonconducting, static-free, flat surface.
n x T1/E1 IMA

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SuperStack II PathBuilder S330 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Superstack ii pathbuilder s310

Table of Contents