Lcd Panel During Boot Sequence - IBM TotalStorage SAN32M1 Installation And Service Manual

Totalstorage
Hide thumbs Also See for TotalStorage SAN32M1:
Table of Contents

Advertisement

Figure 129
Figure 130
228
SAN32M1 Fabric Switch Installation and Service Manual
Shut down windows dialog box
b. Select the Shut Down option from the list box and click OK. The
EFC Server powers down.
c. Wait approximately 30 seconds and press the power button on
the LCD panel to power on the server and perform POSTs.
During POSTs:
1. The green LCD panel illuminates.
2. The green HDD LED blinks momentarily, and processor
speed and random-access memory information display
momentarily at the LCD panel.
3. After a few seconds, the LCD panel displays the following
message pertaining to boot sequence selection
Boot from LAN?
Press <Enter>

LCD panel during boot sequence

4. Ignore the message. After ten seconds, the server performs
the boot sequence from the BIOS. During the boot sequence,
the server performs additional POSTs and displays the
following operational information at the LCD panel:
Host name.
System date and time.
LAN 1 and LAN 2 IP addresses.
(Figure
130):

Advertisement

Table of Contents
loading

Table of Contents