Power-On Procedure; Clean Fiber-Optic Components - IBM TotalStorage SAN32M1 Installation And Service Manual

Totalstorage
Hide thumbs Also See for TotalStorage SAN32M1:
Table of Contents

Advertisement

.
Figure 194

Power-On procedure

346
SAN32M1 Fabric Switch Installation and Service Manual
1

Clean fiber-optic components

3. Gently wipe the end-face and other surfaces of the connector with
an alcohol pad as shown in part 2 of
makes full contact with the surface to be cleaned. Wait
approximately five seconds for surfaces to dry.
4. Repeat
step 2
and
step 3
5. Repeat
step 2
and
step 3
then reconnect the fiber-optic cable to the port.
To power on the switch:
1. One alternating current (AC) power cord is required for each
power supply. Ensure power cord(s) are available to connect the
switch to facility power.
A power cord is provided for each switch power supply. To
prevent electric shock when connecting the switch to primary
facility power, use only the supplied power cord(s), and ensure
the facility power receptacle is the correct type, supplies the
required voltage, and is properly grounded.
2. Turn on both power switches at the rear of the unit. The unit
powers on and performs power-on self-tests (POSTs).
NOTE: If two power cords are used for high availability, plug the cords
into separate facility power circuits.
2
Figure
194. Ensure the pad
of this procedure (second cleaning).
of this procedure again (third cleaning),