Starting Up; The Setup Utility - NEC POWERMATE PROFESSIONAL - SERVICE MANUAL 05-1997 Service Manual

Table of Contents

Advertisement

STARTING UP

Press the power button (see Figure 2-9) to power on the system. The power lamp lights
green, indicating that the system is on.
The system automatically goes into its Power-On Self-Test (POST), and checks system
components. One beep indicates that the system has successfully completed the POST.
If a problem occurs, a series of beeps may sound. If this happens repeatedly after powering
on, power off the system and troubleshoot.
If a problem occurs and is not indicated by beeps, power off the system and troubleshoot.

THE SETUP UTILITY

The Setup utility program allows you to enter system configuration information and control
special features of the system.
NOTE: If the system displays a message
indicating that system settings have changed, run
Setup (see "System Configuration" later in this
section).
Figure 2-9 Power Button
Setup and Operation
2-7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the POWERMATE PROFESSIONAL - SERVICE MANUAL 05-1997 and is the answer not in the manual?

Questions and answers

Table of Contents