Chapter 3 Hardware Installation - TRENDnet TL2-E284 User Manual

Hide thumbs Also See for TL2-E284:
Table of Contents

Advertisement

24-Port 10/100Mbps Layer 2 Switch w/ 4 Gigabit Ports and 2 Shared Mini-GBIC Slots
Unpacking
Switch Installation
Desktop or Shelf
Installation
Rack Installation
3-1
Hardware Installation
This chapter provides unpacking and installation information for TL2-E284.
Open the shipping carton and carefully unpack its contents. Please consult the
packing list located in the User Manual to make sure all items are present and
undamaged. If any item is missing or damaged, please contact your local reseller
for replacement.
TL2-E284
Multi-Language Quick Installation Guide
CD-ROM (User's Guide)
Power Cord (1.8 m / 5.9 ft.)
RS-232 Cable (3 m / 9.8 ft.)
Rack Mounting Kit
Rubber feet
If any item is found missing or damaged, please contact the local reseller for
replacement.
For safe switch installation and operation, it is recommended that you:
Visually inspect the power cord to see that it is secured fully to the AC
power connector.
Make sure that there is proper heat dissipation and adequate
ventilation around the switch.
Do not place heavy objects on the switch.
When installing the switch on a desktop or shelf, the rubber feet included with the
device must be attached on the bottom at each corner of the device‟s base. Allow
enough ventilation space between the device and the objects around it.
Figure 1 – Attach the adhesive rubber pads to the bottom
The switch can be mounted in an EIA standard size 19-inch rack, which can be
placed in a wiring closet with other equipment. To install, attach the mounting
brackets to the switch‟s side panels (one on each side) and secure them with the
screws provided.
Figure 2 – Attach the mounting brackets to the Switch
Then, use the screws provided with the equipment rack to mount the switch in the
Chapter 3

Advertisement

Table of Contents
loading

Table of Contents