Pre-Installation Requirements
Personnel Technical Level Required for Installation
The operations in this section should be performed only by qualified
service personnel experienced in electrical safety techniques. Never
service the analyzer unless power has been removed from the ana-
lyzer, and the analyzer has been allowed to cool enough to work on.
Always use gloves when working on the analyzer.
2-2 | 5920 UHP Moisture Analyzer
PN 592047901 Rev YC