Safety Considerations; Pre-Installation Requirements; Storage Prior To Installation - Ametek IPS-4 User Manual

Dual bench (uv / ir) analyzer zone 1 / division 2
Hide thumbs Also See for IPS-4:
Table of Contents

Advertisement

Safety Considerations

Pre-Installation Requirements

3-2 | IPS-4 Dual Bench (UV / IR) Analyzer
Before beginning the installation of the analyzer and before powering
it up, review and follow all safety requirements under "Important
NOTE
Safety Notes, Warnings, and Cautions" following the Table of
Contents near the beginning of this manual. This information de-
scribes procedures to follow to avoid personal injury and/or damage to
the equipment. All regulatory agency and personnel safety proce-
dures for your jurisdiction must be followed.
!
The IPS-4 Analyzer is certified with regard to electrical safety for
Pollution Degree 2 (normally nonconductive environmental pollution
WARNING
occurs with occasional condensation) and Installation Category II (lo-
cal level transients, less than those found at power distribution level).
Mains supply voltage fluctuations are not to exceed 10 percent of the
nominal supply voltage.

Storage Prior to Installation

If the analyzer and its Optical Bench Assembly are stored for any period
of time prior to installation, store the equipment in an environment where
it is not subject to dripping or splashing liquids, corrosive gases, high
humidity, or excessive heat or cold. Recommended storage conditions
include:
Temperature:
Relative Humidity:
Failure to comply with these storage conditions will void your warranty.
0 °C to 50 °C (32 °F to 122 °F)
< 70 %