Pre-Installation Requirements; Storage Prior To Installation; Uncrating And Inspecting The Analyzer; Tools, Equipment, And Supplies Required To Connect And Prepare The 5100P For Operation - Ametek 5100P User Manual

Tdlas analyzer
Hide thumbs Also See for 5100P:
Table of Contents

Advertisement

Pre-Installation Requirements

Storage Prior to Installation

If the analyzer is stored for any period of time prior to installation, store it in its
shipping case, in an environment where it is not subject to dripping or splash-
ing liquids, corrosive gases, high humidity, or excessive heat or cold. Recom-
mended storage conditions include:
Temperature:
Relative Humidity:
Failure to comply with these storage conditions will void your warranty.

Uncrating and Inspecting the Analyzer

Open the shipping and storage case the 5100P Analyzer is shipped in and
inspect the instrument for damage. If equipment is damaged, notify the carrier
and contact AMETEK Service (https://www.ametekpi.com/customersupport/
requestsupport) immediately if parts are missing or damage is found, and to
verify if damaged parts will require replacement prior to safely connecting and
operating the analyzer.
Tools, Equipment, and Supplies Required to
Connect and Prepare the 5100P for Operation
To prepare the analyzer for operation you need the following tools, equip-
ment, and supplies:
2-2 | 5100P TDLAS Analyzer
-20 to +50 °C (-4 to 122 °F)
<90 %
Set of open-end wrenches for fittings.
Detergent-based leak detector (Snoop® or another suitable leak detection
agent is permissible).
PN 9000-246-VE, Rev D

Advertisement

Table of Contents
loading

Table of Contents