Electrical Safety
Hazardous voltages are present in the analyzer housings when power is applied to the
system. Always shut down power source(s) before performing maintenance or trouble-
shooting. Only a qualified electrician should make electrical connections and ground
checks.
Any use of the equipment in a manner not specified by the manufacturer may impair
the safety protection originally provided by the equipment.
Grounding
Instrument grounding is mandatory. Performance specifications and safety protection
are void if instrument is operated from an improperly grounded power source.
Sample Gas
viii | 5920 UHP Moisture Analyzer
Verify ground continuity of all equipment before applying power.
Potential hazards of the sample gas should be taken into consideration before
connecting the sample to the analyzer. Personal protective equipment and
proper ventilation should be used if sample gas is toxic, flammable, or corro-
sive. Check the sample line and all connections for leaks before powering up.
Consult plant safety personnel for appropriate exhaust venting guidelines for
specific sample gas type.
PN 592047901 Rev YC